Terminal-Bench Science

/ tasks

​
HF Dataset
All tasks (102)
Engineering
Life Sciences
Physical Sciences
Earth Sciences
Mathematical Sciences
Novelty ≥ 65%
electrical-engineering

Showing 102 of 102 benchmark tasks · click a card for source

task-30-code
#30
Engineering · electrical-engineering · research-technology-development / mixed-signal programmable filters

Resolve and certify a patent-grounded programmable-notch command channel from coupled mixed-signal, protocol, formal, spatial, and acoustic evidence.

novelty 63%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-31-code
#31
Engineering · electrical-engineering · optical-communications-and-photonic-networking

Schedule predecessor-dependent optical contacts for Aitken basin science egress under a hardware-limited rate ladder, and report delivered volume versus the legacy shortest-path router and a contention bus.

novelty 57%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-32-code
#32
Engineering · electrical-engineering · research-technology-development / acoustic hardware forensics

Reconstruct a recovered acoustic sensing head, diagnose its channel-phase fault, and replay a native mixed-signal calibration pipeline on hidden hardware cases.

novelty 70%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-33-code
#33
Engineering · electrical-engineering · research-technology-development / acoustic array incoming-lot verification

Audit a relabeled PDM acoustic array by reconciling spatial inspection, raw dual-edge capture, multimodal reference evidence, mixed-language HDL, synthesis, formal assignment, analog simulation, and a corrected KiCad board.

novelty 61%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-34-code
#34
Engineering · electrical-engineering · research-technology-development / airborne ultrasonic array reverse engineering

Reverse-engineer a defective airborne parametric ultrasonic rangefinder from coupled electrical, spatial, acoustic, and environmental evidence and certify a thinned-aperture proof-of-concept respin.

novelty 60%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-35-code
#35
Engineering · electrical-engineering · research-and-technology-development

Reconstruct a research-grounded infrasound array node across digital, pneumatic, analog, spatial, constraint, and PCB evidence, then emit an exact result vector and board.

novelty 59%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-36-code
#36
Engineering · electrical-engineering · Research & Technology Development (reverse engineering)

Recover an ambiguous atmosphere-sensing node from multimodal field and design evidence, then produce its engineering result and a native KiCad replacement board.

novelty 61%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-37-code
#37
Engineering · electrical-engineering · research-technology-development / infrasound instrumentation

Diagnose and re-release a faulted four-port infrasound node across a coupled mixed-signal, array-processing, and KiCad workflow; verification dependencies are installed system-wide inside the isolated verifier image.

novelty 61%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-38-code
#38
Engineering · electrical-engineering · clock-domain crossing / synchronizer metastability / hardware-software timing verification

Certify the MTBF-maximizing admissible synchronizer depth for a thermally set clock-boundary metastability failure and emit its 37-key incident vector.

novelty 63%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-39-code
#39
Engineering · electrical-engineering · research-and-technology-development

Determine which physical or electrical constraint limits active tail-first recovery of a passively unstable fixed-fin booster.

novelty 69%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-40-code
#40
Engineering · electrical-engineering · research-technology-development / seismo-acoustic instrumentation

Commission a multimodal four-node infrasound acquisition design, diagnose an out-of-spec inlet, and reconcile its directional estimate with independent geophysical observations.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-41-code
#41
Engineering · electrical-engineering · research-and-technology-development

Determine electrical and layout compliance for an edge-AI compute rail from calibrated acoustic, patent-drawing, HDL, circuit, formal, and PCB evidence, then identify the supported corrective architecture.

novelty 68%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-42-code
#42
Engineering · electrical-engineering · research-technology-development / reproduce-from-figure

Recover and reconcile an RF acoustic ladder from a mixed-source engineering package, select a feasible board architecture, and deliver a self-consistent KiCad proof of concept.

novelty 75%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-43-code
#43
Engineering · electrical-engineering · acoustic-array-signal-processing-and-mixed-signal-systems

Qualify an eight-microphone passive acoustic counter-UAS HAT node by combining native PCB, mixed-signal, formal, RTL, synthesis, and capture analyses into a strict 42-key acceptance decision.

novelty 62%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-44-code
#44
Engineering · electrical-engineering · research-technology-development / passive acoustic counter-UAS

Reconstruct a passive acoustic counter-UAS HAT from coupled native engineering artifacts and certify its array, mixed-signal chain, and replacement board.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-45-code
#45
Engineering · electrical-engineering · research-technology-development / passive acoustic sensing

Reverse-engineer a recovered passive-acoustic counter-UAS node from spatial, acoustic, PCB, circuit, and digital evidence and certify its prototype verdict.

novelty 64%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-46-code
#46
Engineering · electrical-engineering · research-technology-development / passive acoustic counter-UAS

Reconstruct and qualify a 24-channel PDM counter-UAS microphone node from spatial, visual, acoustic, digital, PCB, and mixed-signal evidence.

novelty 68%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-47-code
#47
Engineering · electrical-engineering · Research & Technology Development (reproduce-and-merge-from-figure)

Reconstruct and verify a DAIRS-inspired mixed-signal ambient-noise radar seed node, then realize its residual delay as matched PCB copper.

novelty 66%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-48-code
#48
Engineering · electrical-engineering · research-technology-development / acoustic array and mixed-signal HAT synthesis

Recover a six-microphone acoustic HAT and the recorded source bearing from coupled electrical, physical, acoustic, and spatial evidence.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-49-code
#49
Engineering · electrical-engineering · research-technology-development / acoustic wake-up hardware assurance

Reconstruct and diagnose a provenance-scoped N-ZERO-lineage acoustic wake-up module from coupled board, drawing, waveform, circuit, formal, HDL, and government-media evidence.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-50-code
#50
Engineering · electrical-engineering · research-and-technology-development

Reconcile a multimodal four-channel EMAT inspection, guided-wave physics, mixed-signal acquisition, and fabrication evidence into a screening proof of concept.

novelty 72%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-51-code
#51
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 51 evaluation.

novelty 58%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-52-code
#52
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 52 evaluation.

novelty 72%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-53-code
#53
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 53 evaluation.

novelty 69%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-54-code
#54
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 54 evaluation.

novelty 69%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-55-code
#55
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 55 evaluation.

novelty 67%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-56-code
#56
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 56 evaluation.

novelty 68%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-57-code
#57
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 57 evaluation.

novelty 68%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-58-code
#58
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 58 evaluation.

novelty 66%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-59-code
#59
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 59 evaluation.

novelty 65%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-60-code
#60
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 60 evaluation.

novelty 71%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-61-code
#61
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 61 evaluation.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-62-code
#62
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 62 evaluation.

novelty 67%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-63-code
#63
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 63 evaluation.

novelty 66%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-64-code
#64
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 64 evaluation.

novelty 67%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-65-code
#65
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 65 evaluation.

novelty 68%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-66-code
#66
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 66 evaluation.

novelty 65%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-67-code
#67
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 67 evaluation.

novelty 65%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-68-code
#68
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 68 evaluation.

novelty 65%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-69-code
#69
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 69 evaluation.

novelty 64%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-70-code
#70
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 70 evaluation.

novelty 64%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-71-code
#71
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 71 evaluation.

novelty 63%
SOURCE REPORTED GREEN
Astra unmeasured

Independent Researcher
task-72-code
#72
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 72 evaluation.

novelty 65%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-73-code
#73
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 73 evaluation.

novelty 66%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-74-code
#74
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 74 evaluation.

novelty 63%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-75-code
#75
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 75 evaluation.

novelty 63%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-76-code
#76
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 76 evaluation.

novelty 63%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-77-code
#77
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 77 evaluation.

novelty 62%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-78-code
#78
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 78 evaluation.

novelty 62%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-79-code
#79
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 79 evaluation.

novelty 73%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-80-code
#80
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 80 evaluation.

novelty 70%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-81-code
#81
Engineering · electrical-engineering · geothermal-instrumentation

Evaluate geothermal sonde geophone shunt damping, high-temperature copper TCR and remanence shift, and reconstruct microseismic hypocenters.

novelty 66%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-82-code
#82
Engineering · electrical-engineering · propulsion-instrumentation

Terminal-Bench Science task 82 evaluation.

novelty 53%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-83-code
#83
Engineering · electrical-engineering · instrumentation-and-safety-systems

Terminal-Bench Science task 83 evaluation.

novelty 52%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-84-code
#84
Engineering · electrical-engineering · acoustic-instrumentation

Reconstruct 2D flue gas temperature field and velocity distribution in a Heat Recovery Steam Generator (HRSG) using acoustic pyrometry time-of-flight tomography.

novelty 73%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-85-code
#85
Engineering · electrical-engineering · Research & Technology Development; guided-wave EMAT transducer design for in-situ additive-manufacturing inspection

Terminal-Bench Science task 85 evaluation.

novelty 54%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-86-code
#86
Engineering · electrical-engineering · research-and-technology-development

Reconstruct a synthetic MQXF-like 8-channel acoustic-emission instrument, de-embed its timing, localize a conductor-motion precursor with a 4.5 K surrogate material model, and deliver a 24-key result plus a semantically verified native KiCad board.

novelty 55%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-87-code
#87
Engineering · electrical-engineering · superconducting-magnet-protection

Reconstruct a superconducting-magnet quench-protection crate, adjudicate its failure, and respin the detector board.

novelty 53%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-88-code
#88
Engineering · electrical-engineering · mems-mixed-signal-design

Terminal-Bench Science task 88 evaluation.

novelty 54%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-89-code
#89
Engineering · electrical-engineering · research-and-technology-development

Reconstruct a shared orbital additive-manufacturing sensing-and-drive board and diagnose a qualification failure from a coupled electrical evidence record.

novelty 59%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-90-code
#90
Engineering · electrical-engineering · transformer diagnostics and high-voltage instrumentation

Terminal-Bench Science task 90 evaluation.

novelty 53%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-91-code
#91
Engineering · electrical-engineering · research-and-technology-development

Qualify one transient-forensics timing head across four physical coupons by reconstructing its analog, HDL, signal, formal, and PCB evidence chain.

novelty 51%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-92-code
#92
Engineering · electrical-engineering · accelerator-rf-controls

Reconstruct and verify a coupled SRF cavity, cryogenic piezo-tuner drive, and LLRF controller proof of concept.

novelty 51%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-93-code
#93
Engineering · electrical-engineering · guided-wave-nde

Reassess a failed guided-wave qualification and issue a single-fault-tolerant EMAT replacement.

novelty 51%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-94-code
#94
Engineering · electrical-engineering · research-and-technology-development

Fuse synthetic LPBF acoustic-emission, machine-timing, and CT evidence, then redesign and validate the mixed-signal monitoring node.

novelty 55%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-95-code
#95
Engineering · electrical-engineering · additive-manufacturing-instrumentation

Register an augmented XCT-void population to a byte-exact NIST process layer and multimodal LPBF evidence, adjudicate provenance and a contracted qualification-screening disposition, characterize the mixed-signal monitor, and emit a verified four-layer KiCad proof of concept.

novelty 56%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-96-code
#96
Engineering · electrical-engineering · electric machines and sensor instrumentation

Infer a traction machine's winding integers from dual-channel order measurements and turn them into a verified quadrature inductive-sensor PCB.

novelty 51%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-97-code
#97
Engineering · electrical-engineering · research-and-technology-development

Reconstruct a synthetic recovered phase-OTDR/DAS interrogator and its helical undersea cable mapping from a multichannel audio capture, exactly five USPTO patent figures, native mixed-signal, HDL, formal, PCB, and spatial evidence, then adjudicate the localized event and publish the mutually consistent /workdir artifacts.

novelty 51%
SOURCE REPORTED GREEN
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-98-code
#98
Engineering · electrical-engineering · intrinsically safe downhole instrumentation

Recover installed sensor-string depth from first-arrival checkshots and certify downhole intrinsic-safety barrier board for Group I methane atmosphere.

novelty 72%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-99-code
#99
Engineering · electrical-engineering · research-technology-development / programmable mixed-signal

Reconstruct a programmable mixed-signal notch channel from coupled native design artifacts and certify its admissible command population.

novelty 55%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-100-code
#100
Engineering · electrical-engineering · cybersecurity-cryptography

REVIEW TASK (contractor/expert ingest evidence; not original authoring identity): recover secp256k1 signing capability from multi-worker ECDSA audit telemetry and emit a valid target signature via /app/solve.py → /app/output/result.json.

novelty 57%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-101-code
#101
Engineering · electrical-engineering · binary-protocol-conformance

REVIEW TASK (contractor/expert ingest evidence; not original authoring identity): produce /app/solve.py that implements the challenge-response contract of /app/validator for arbitrary challenges (defensive / QA conformance framing).

novelty 54%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-102-code
#102
Engineering · electrical-engineering · uefi-incident-response

Neutralize a UEFI PartitionDxe bootkit hook in an LZMA-compressed OVMF firmware image and write a JSON remediation report.

novelty 55%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-103-code
#103
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science task 103 evaluation.

novelty 53%
SOURCE REPORTED GREEN
W5 PASS
Astra 0.00

Independent Researcher
task-104-code
#104
Engineering · electrical-engineering · Research & Technology Development (reproduce-and-merge-from-figure)

Independent verification and validation of a field-deployable CRISPR-Cas12a detection cartridge: refute or confirm three vendor performance claims by synthesising instrument drawings, tool sidecars, bench acoustic capture, sequence specificity and field-matrix evidence.

novelty 51%
SOURCE REPORTED GREEN
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-105-code
#105
Engineering · electrical-engineering · Neurosymbolic probabilistic inference and verification: weighted model counting, knowledge-compilation audit, weak-label calibration, regulatory rule encoding (proposed Domain E)

Terminal-Bench Science task 105 evaluation.

novelty 62%
W5 PASS
Astra 0.00

Independent Researcher
task-106-code
#106
Engineering · electrical-engineering · Research & Technology Development (energy-aware ML measurement to deployment), subdomains 1-9 merged into 10

Joule-ledger audit for a DARPA ML2P-style T&E decision: attribute training and inference energy from raw H200 and ZCU102 telemetry, rebuild the rail sense chain and kernel timing, and decide whether to distil and where to deploy.

novelty 60%
W5 PASS
Astra 0.00

Independent Researcher
task-107-code
#107
Engineering · electrical-engineering · Energy-aware ML systems: edge-inference and training energy metrology (Domain D)

Energy audit of a DARPA SBIR DV019 semantic-ISR Phase II package: rebuild a performer's five claims from onboard rail and latency captures, MLPerf-derived facility power logs and a shared teacher cache, certify incremental module power against the 2 W objective, and decide whether the distilled detector repays its training energy over the planned sorties.

novelty 60%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-108-code
#108
Engineering · electrical-engineering · Neuromorphic & Biohybrid Computing (reproduce-and-merge-from-figure; proposed Domain E)

Independent verification and validation of a biohybrid biological processing unit against an O-CIRCUIT-style Phase-1 gate: attribute closed-loop game performance to the living culture versus the silicon decoder, audit the metabolic energy boundary in joules, replay the stimulus schedule through the deployed controller arbitration, measure the culture's evoked response, and certify stimulation safety and adversarial robustness.

novelty 63%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-109-code
#109
Engineering · electrical-engineering · Power & Energy Systems: energy-aware ML training and inference (proposed Domain E pack; ML research toolchain in place of the netlist/HDL toolchain, author election)

Audit a power-constrained AI site's daily energy plan: the Zeus-selected fine-tuning configuration, the serving configuration that meets demand at least energy, a monitored pilot day, and carbon booked two ways, then state whether the daily allotment holds.

novelty 62%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-110-code
#110
Engineering · electrical-engineering · Energy-aware ML systems - computing energy metrology (Domain D pack; REQUIREMENTS Part IV)

Lifecycle joule ledger for a DARPA ML2P-style fielding decision: reconcile teacher-node, student-node, edge-node, NPU and radio telemetry at one accounting boundary, choose the training pipeline and serving plan under a per-sortie battery budget, and state whether the instruments resolve what the budget costs.

novelty 68%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-111-code
#111
Engineering · electrical-engineering · Domain S (cryptography, digital forensics and application security) - inference over artifacts; subdomains 1-9 merged into 10

Adjudicate a cyber-reasoning assurance filing for an AI inference gateway: resolve crash signatures into root causes, restrict to runtime-reachable targets, correct the trial count for serial dependence, and decide whether the declared escape-probability acceptance bound is met.

novelty 54%
W5 PASS
Astra 0.00

Independent Researcher
task-112-code
#112
Engineering · electrical-engineering · Software supply-chain assurance - Domain S subdomain S10 (the merge); REQUIREMENTS Part IV

Release-gate audit for a software supply chain: reconcile a degenerate SBOM, lockfile, call graph, deployment manifest, exploitation feeds, upgrade lattice and build attestation for nine advisories against the ORCHID-7B gateway, and decide the release under a policy that withholds the reachability veto when the dependency graph cannot support it.

novelty 65%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-113-code
#113
Engineering · electrical-engineering · Autonomous cyber-reasoning systems - patch-efficacy IV&V audit (Domain M pack; REQUIREMENTS Part IV)

Open-ended AppSec IV&V: audit a vendor's 71% autonomous patch solve-rate claim for public-interest / humanitarian-class fleets; grade contamination-corrected recoveries by goodness-of-fit vs an independently derived oracle reference (anti-frankenbundle consistency), plus an open audit memo.

novelty 63%
W5 HELD-IRREDUCIBLE
Astra 1.00

Independent Researcher
task-114-code
#114
Engineering · electrical-engineering · Domain S - cryptography, digital forensics and application security; R&TD merge (S1-S9 into S10)

Refute a software factory's post-incident scope claim by reconciling rebuild divergence, attestation binding, key lifecycle and reachability over its own shipped record.

novelty 64%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-115-code
#115
Engineering · electrical-engineering · hardware-systems

Terminal-Bench Science evaluation task 115.

novelty 55%
UNBUILT
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-116-code
#116
Engineering · electrical-engineering · Forensic Statistics / Evidentiary Computing (proposed Domain F)

Evidentiary chronology across six seized sources on four machines, each on its own clock: verify block-granular custody tags, expel hand-set timestamps from the calibration, fit the clocks with an explicit uncertainty budget, bound a journal destruction from sequence counters, and answer whether the record proves the controlled technical data left the network before the award notification went out.

novelty 56%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-117-code
#117
Engineering · electrical-engineering · Domain S - cryptography, digital forensics and application security; subdomain S10 (R&TD merge), subdomains S1-S9 merged

Adjudicate a forensic contractor's recovered-set certification for a returned servo-drive controller: establish the page layout the non-volatile memory image was actually acquired at rather than the one its integration guide declares, recover the logical addressing and program order from the spare area, separate the reassemblies that layout invalidates from the superseded physical copies the flash translation layer left behind, re-anchor the filed window against the one externally attested instant in the uplink capture, settle the acquisition trust chain at the instant the manifest designates, and select the one enumerated intervention that returns the attributable record count above the evidence board's floor.

novelty 55%
W5 PASS
Astra 0.00

Independent Researcher
task-118-code
#118
Engineering · electrical-engineering · Embedded-device incident forensics - custody-window adjudication

Digital-forensics custody adjudication: reconstruct an exfiltration window across a FAT local-time vault and an ext4 UTC partition on a DST fall-back night, verify an RSA-accumulator sealed extract, count IV-reuse-recoverable records from a pcap and CBOR key schedule, attribute the carrying library from wire bytes and an ELF core, check MAB attestation binding and RFC 5280 path validity at the stated time, score CVSS 3.1/4.0 environmental, and issue a custody disposition.

novelty 62%
W5 PASS
Astra 0.00

Independent Researcher
task-119-code
#119
Engineering · electrical-engineering · finite-sample inference over contaminated validation records

Independent assurance review of a contractor's residual-exploitability filing for an AI inference service: correct a contaminated validation record, recompute the false-negative interval against a dependence-adjusted effective size, separate static reachability from runtime execution, check the attested artifact against the deployed one, read quantization layout and counter-boundary energy off the shipped binaries, and solve the constrained minimum-cost upgrade set.

novelty 60%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-120-code
#120
Engineering · electrical-engineering · digital design automation - RTL signoff

Adjudicate a tapeout power-signoff filing for a clock-gated telemetry-framer block: recover what the gated register bank does at the slow corner from the netlist, library, delay annotation, proof output and activity record, and decide whether the filed claim survives.

novelty 61%
W5 PASS
Astra 0.00

Independent Researcher
task-121-code
#121
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify the greatest sustained transfer rate of a delivered two-domain handoff block against a release gate, reconciling the as-built board operating point, the delivered netlist, a device-level transient capture and the supplied coverage record.

novelty 67%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-122-code
#122
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify the repairable yield of a delivered SRAM macro across an engineering lot, reconciling the redundancy the delivered repair wrapper makes independently allocatable, the array operating point the board imposes under built-in self-test activity, the repair-sequencer fuse protocol and the wafer-sort fail bitmaps, then select the one enumerated intervention that restores the acceptance gate's yield floor.

novelty 63%
W5 PASS
Astra 0.00

Independent Researcher
task-123-code
#123
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Adjudicate a vendor's pre-silicon no-leak sign-off for a delivered accelerator macro by narrowing the seed register's observable sinks through the delivered netlist, the lifecycle guard, the package bond map and the board-corner capture decision, and deciding whether the claim stands.

novelty 64%
W5 PASS
Astra 0.00

Independent Researcher
task-124-code
#124
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify the greatest stuck-at coverage attainable for a delivered scan test set inside a fixed tester budget, reconciling the delivered netlist's capture behaviour, a device-level supply-rail transient taken during shift, the tester interface protocol and the vendor's fault dictionary, then select the one intervention that restores the gate's coverage floor.

novelty 69%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-125-code
#125
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify the repair yield attainable for a delivered memory lot when the spare column elements the gate-level netlist can address independently are fewer than the inventory declares and the programming rail will not sustain the vendor's concurrent fuse count, then select the one enumerated intervention that restores the gate's yield floor.

novelty 63%
W5 PASS
Astra 0.00

Independent Researcher
task-126-code
#126
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Adjudicate a vendor's claim that a post-tape-out functional fix is implementable as a metal-only engineering change order, reconciling the spare cells the delivered netlist actually leaves available, the rail the ECO region actually holds, the reachable input space of the patch cone and the timing the patch site leaves, then select the one intervention that restores compliance with the release gate.

novelty 70%
W5 PASS
Astra 0.00

Independent Researcher
task-127-code
#127
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify a delivered accelerator macro's DVFS operating-point table over the reachable regulator-code and divider-ratio lattice, reconciling the delivered netlist's critical path, the power-delivery network's impedance at the workload's own burst excitation frequency, and the in-macro droop-response controller's mitigation duty; then select the certified peak-throughput and minimum-energy operating points and the one remedy that restores the required peak throughput.

novelty 63%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-132-code
#132
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Attribute a delivered sparse matrix tile's two bring-up symptoms to their separate mechanisms when the vendor reports a single cause: recover the shared metadata select decode from the delivered netlist, separate structurally conflicting metadata groups from the ones that change a result, measure the refill stall and the adaptive-clock hold cycles that overlap it, decompose the operand-broadcast rail excursion into its on-die and board components, bound the best admissible weight recompile exactly, and choose the one enumerated intervention that brings the part inside both release limits.

novelty 67%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-135-code
#135
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Determine the link configuration a two-supplier die-to-die module can actually sustain, and the bring-up sequence that reaches it, reconciling the lane-repair topology the delivered netlist implements against the one the integration guide declares, the skew the repair shift itself introduces, the round-trip credit-return latency of the delivered path under a fractional link-clock division, and a repair allocation that is latched during the first training attempt before the receiver's phase interpolator has converged.

novelty 66%
W5 HELD-IRREDUCIBLE
Astra held

Independent Researcher
task-136-code
#136
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify a delivered chiplet die-to-die link subsystem's published configuration table over the reachable lattice of synthesisable per-lane rates and transmit de-emphasis codes, reconciling the repair capability the delivered netlist actually implements, the lane skew the delivered deskew element cannot remove, and the substrate's insertion-loss suck-out read at the Nyquist frequency of each rate; then select the certified peak-bandwidth and minimum-energy operating points, attribute the advertised peak mode's disqualification, and choose the one remedy that restores the required peak bandwidth.

novelty 66%
W5 BLOCKED
Astra unmeasured

Independent Researcher
task-139-code
#139
Engineering · electrical-engineering · Domain H - silicon design, RTL verification and EDA sign-off; subdomain 10 (R&TD merge), subdomains 1-9 merged

Certify the sustained MAC utilisation a delivered matrix-multiply tile achieves under its release schedule when the gate-level netlist addresses fewer accumulator tiles than the configuration declares and the compute rail will not sustain the assumed concurrent row count, then select the one enumerated intervention that restores both the utilisation floor and the declared bit-exact conformance.

novelty 61%
W5 BLOCKED
Astra unmeasured

Independent Researcher